Fuel Cladding

FROM ORE TO ENERGY · PART 5

Fuel in the Reactor

During operation, fission, neutron capture and radioactive decay change the isotopic composition of the fuel. Burnup measures the thermal energy produced per unit initial mass of heavy metal, but does not fully describe the fuel’s condition; the core neutron balance, power distribution and condition of the fuel rods must also be considered. After discharge, the fuel still contains uranium and fissile isotopes, and its radionuclide inventory continues to change during cooling. Decay heat, radiation source terms and the remaining fissile inventory determine the requirements for cooling, shielding, confinement of radioactive material and maintenance of subcriticality.

Read More

When a fuel rod develops a leak

In a pressurized water reactor, even a small fuel rod leak can change the radionuclide composition of the primary coolant before the fuel becomes accessible for direct inspection. Assessing cladding condition requires relating isotopic composition, activity levels and their time histories to the operating history. Analysis of damage mechanisms and correlation of radiochemical measurements with outage inspections allow the fuel condition to be verified in stages and support operating decisions.

Read More

FROM ORE TO ENERGY · PART 4

Nuclear Fuel Fabrication

Fuel fabrication for light water reactors comprises the conversion of enriched UF₆ into UO₂ powder, pressing and sintering of fuel pellets, fuel rod fabrication and fuel assembly construction. The ceramic microstructure, porosity and component geometry influence heat transfer and mechanical behaviour during operation. Quality control verifies conformity with design requirements, while traceability links the product to the materials used, manufacturing processes and inspection results.

Read More