reactor operations

From Trip Signal to Stable State

After a rapid reactor shutdown, fission power falls sharply, but the need for cooling remains. The protection signal must be followed by verification of the actual response, maintenance of subcriticality and assured heat removal. Reaching a stable state brings together system performance, assessment of measurements and coordinated crew action. Its significance lies in the ability to sustain the required safety functions over the long term.

Read More